A new soap packaging facility in Oakville needed its entire production floor coated. At 24,000 sq ft, the floor had to be ground and coated on a tight four-day schedule. Request a free estimate to discuss your facility.
The Challenge
Soap spills and residue on a smooth floor create a serious slip hazard for staff, so the finished floor needed texture across the whole facility, not only in walkways. It also had to resist cleaning chemicals, stand up to pallet jacks and forklifts, and be completed across 24,000 sq ft in four days.

The System
We diamond ground the new concrete across the full facility, then installed a 100% solids epoxy with a full broadcast of aggregate, so texture runs throughout the facility. The system was finished with a light grey solid epoxy from Ureco, which locks in the aggregate and gives the plant a bright, uniform floor that is easy to clean.


Keeping to the Schedule
Our crew worked through the facility in sections, grinding and coating about 6,000 sq ft a day, so the full 24,000 sq ft was completed in four days.
The Result
- 24,000 sq ft ground and coated in four days
- Full aggregate texture throughout the facility for grip around soap and spills
- A light grey Ureco epoxy finish that is bright and easy to clean
- A chemical-resistant floor ready for production equipment and forklift traffic

Floors for Manufacturing and Packaging
New buildings and working plants each need a system and schedule matched to how the floor will be used. We review the slab, the traffic and your opening date, then recommend the system. See our manufacturing epoxy flooring and warehouse epoxy flooring pages, or book a free site assessment.