Supreme Epoxy
Home About Us
Services
Floor Coatings
Service Areas
Resources
Contact Call (437) 239-1165 Get a Free Quote

Epoxy Flooring Cost

What drives the price of an epoxy floor in Toronto and the GTA, how we build a quote, and how to get an exact number for your space.

Cost guide

The Six Things That Set the Price of an Epoxy Floor

Floor Area

Larger areas cost more in total, but the price per square foot usually falls as the area grows.

Concrete Condition

Cracks, pits, old coatings and uneven areas add preparation and repair work.

The System

Flake, solid colour, metallic, polyaspartic and urethane cement have very different materials and labour.

Finish and Extras

Cove base, stairs, borders, line marking and slip-resistant texture all add to the scope.

Moisture

Damp slabs may need moisture-mitigating primers or a different system.

Access and Schedule

Overnight, phased or hard-to-access work takes more planning and time.

Why We Do Not Publish One Price per Square Foot

The most common first question is what epoxy flooring costs. The accurate answer is that it depends on the project, and any single number you see online conceals significant variation. Two floors of the same size can have very different prices because one slab is sound and clean and the other needs crack repair, old coating removal and moisture control. We prefer to see the floor, measure it and give you a written quote that reflects your actual space, not an average. Request a free estimate to discuss your project.

How an Epoxy Floor Quote Is Built

Every quote from Supreme Epoxy is based on the same building blocks, which you can see itemized in your written proposal:

1

Preparation

Diamond grinding or shot blasting, cleaning and dust control. This is the foundation and is never skipped.

2

Repairs

Crack, joint and pit repair and levelling where the slab needs it.

3

The Coating System

Primer, base coat, flake or metallic effect and topcoat, chosen for how the space is used.

4

Extras and Detailing

Cove base, stairs, borders, safety lines and texture where specified.

5

Scheduling and Access

Overnight, weekend or phased work and any difficult access.

How the Main Systems Compare

Without quoting numbers, here is how the common systems generally compare on cost and use:

  • Solid-colour epoxy: usually the most economical decorative system. Clean, modern and straightforward.
  • Flake epoxy with a clear topcoat: a middle ground. More materials and labour than solid colour, and the most popular for garages. See epoxy flake flooring.
  • Polyaspartic topcoat: adds to the system cost but delivers faster cure and UV stability. See polyaspartic coatings.
  • Metallic epoxy: usually the highest in the decorative range because of hand work and multiple coats. See metallic epoxy.
  • Urethane cement and heavy-duty systems: specialized systems for demanding commercial and industrial spaces. See urethane cement.

The cheapest quote is rarely the cheapest floor. Skipping grinding, using thin coatings or ignoring moisture can save money on day one and cost far more when the floor peels. Compare what is included, not just the total.

What a Good Quote Should Include

  • The area and exactly where the work will be done
  • The preparation method (grinding or shot blasting) and repairs
  • The full system: primer, base, flake or metallic, topcoat
  • Any extras such as cove base, stairs or line marking
  • The schedule, return-to-service times and cleanup
  • How moisture and slab conditions will be handled

Residential, Commercial and Industrial Pricing Differences

Residential garages and basements are typically quoted by area with a standard system. Commercial and industrial projects add scheduling, phasing and performance requirements such as chemical resistance, slip resistance or static control, so scope varies more. See our pages for garages, commercial floors and industrial floors for what is typical in each.

How to Get an Exact Number

Book a free site visit. We will measure, test the concrete, show samples and send a written quote, usually within a day or two of the visit. There is no obligation. You can also send us your details and photos and we will let you know what to expect before we visit.

How it works

How We Quote Your Floor

Tell Us About Your Space

Call or send the form with the size, location and what you want to achieve.

Site Assessment

We measure, test the slab for cracks and moisture and show samples.

Written Scope

We put the system, preparation, schedule and extras in writing.

Clear Quote

You receive an itemized quote you can compare and keep.

Schedule the Install

When you are ready, we book the installation and confirm return-to-use times.

Client testimonials

What Our Clients Say About the Process

★★★★★

"Beautiful job. Impressed with the quality of work, explanation of the process, great communication, and they left the job site very clean."

M
Marc PedneaultGoogle review
★★★★★

"Very impressed with their quality of work, explanation of the process and their cleanliness. Hamza's communication was amazing. He broke everything down step by step."

M
Megan D.Google review
★★★★★

"I recently had epoxy flooring installed in my garage and couldn't be happier with the results. The team was incredibly polite, professional, and respectful of my home. The finish is smooth, clean, and exactly what I envisioned."

S
Susannah GreenGarage floor · Google review
Questions

Epoxy Flooring Cost FAQ

How much does epoxy flooring cost in Toronto?
It depends on the area, the condition of the concrete, the system and finish, and the schedule. We give a written quote after a free site visit so the number reflects your real space.
Why do epoxy quotes vary so much between companies?
Preparation, system thickness, materials and what is included vary widely. A low quote may skip grinding, use a thin coating or leave out repairs, so compare the scope as well as the total.
Is polyaspartic worth the extra cost?
For many garages, yes. It cures faster, resists UV yellowing and stands up to hot tires. We explain the trade-off for your space.
Does a larger floor cost less per square foot?
Often yes, because set-up and mobilization costs are spread across more area. Complex layouts and heavy repairs can offset that.
Can I save money by doing it myself?
Retail kits are thin and usually skip diamond grinding, which is why they often peel. Professional preparation and materials are what make a floor last, so we recommend them.
Do you offer free estimates?
Yes. We visit the site, measure the area, check the concrete and give you a written quote with no obligation.
Service areas

Quotes Across the GTA

Supreme Epoxy completes projects across Toronto and the Greater Toronto Area.

Request a Site Assessment

Book a free site visit and get an itemized written quote with no obligation.

Get My Free Quote