A food processing plant in Etobicoke needed a new floor in the area that houses its pilot production line. The existing epoxy coating was failing in places, new floor drains had just been installed, and the floor had to be finished before a new enclosure was built over part of the space. Request a free estimate to discuss your facility.
The Challenge
The old coating had started to lift and wear through, and the concrete around the new trench drain and floor drains had been cut and patched by the drain installer. The new floor needed to bond properly, give staff grip in a wet production area and stay easy to clean. The pilot plant also kept operating nearby, so dust had to stay out of the air.

Preparation and Repair
We removed the existing coating from the work area and mechanically ground the concrete to the profile the new system needs to bond. Cracks, spalls and surface defects were repaired before coating. Every grinder was connected to a HEPA dust extractor, so dust was contained at the machine and the pilot plant could keep running.
The System
We installed a 100% solids epoxy system in charcoal. The first coat primes and bonds to the prepared concrete. The second coat received a broadcast aggregate for slip resistance and texture, and the system was sealed to lock in the aggregate and add chemical resistance.


Coating Around the New Drains
The surrounding area, including the repaired concrete at the new drains, was ground and coated at the same time. The facility now has one continuous finish across approximately 2,530 sq ft instead of new patches meeting old coating.
The Result
- Approximately 2,530 sq ft completed in three days
- Failing coating removed and the concrete repaired before coating
- A textured, slip-resistant surface that is easy to clean
- Dust controlled with HEPA extraction while the pilot plant kept operating
- Light foot traffic the next day and full traffic after 72 hours
Floors for Food and Industrial Facilities
Production rooms, washdown areas, coolers and mechanical rooms each need a system matched to how the space is used. We review the slab, the drains, the equipment and your schedule, then recommend the system. See our food processing plant flooring and industrial epoxy flooring pages, or book a free site assessment.